|
|
Independent Consultant - Engineering and Construction |
|
|
|||||||||||
|
Check out for the links to Interesting Projects |
|
|
|||||||||
|
|
|
||||||||||
|
RECENT PROJECTS |
|
||||||||||
|
|
|
||||||||||
|
|
|
|
|||||||||
|
|
Design of Steel Structure – International
Exhibition Centre, |
|
|||||||||
|
|
Tung Chung Road Improvement, |
|
|||||||||
|
|
|
||||||||||
|
|
Consultant – Design of 270 m span casualty hanger
for Thai Airways, for the |
|
|||||||||
|
Consultant – Design of maintenance Hanger for
Bangkok Airways, for the |
|
||||||||||
|
Project Manager - Design of Interchanges: IBRD
Fifth Highway Sector Project (Department of Highways) |
|
||||||||||
|
|
Consultant to contractor - Design of the |
|
|||||||||
|
|
Engineering Manager to contractor - Design and Engineering of the Don Muang Tollway BOT project (Dywidag Consortium) |
|
|||||||||
|
|
Project Manager and Resident Engineer for the Don Muang Tollway, North and South Extensions. (Department of Highways) |
|
|||||||||
|
|
Design of |
|
|||||||||
|
|
Design of Elevated Approach Structures from Don Muang Tollway to the proposed Morchit BTS Terminal (consortium of Thai consultants) |
|
|||||||||
|
|
Design of foundations of Rama 8 cable stayed bridge (for Philip Holzmann) |
|
|||||||||
|
|
Design (QA) review of Hyatt Regency Hotel, Hua Hin (for Siam Syntech Construction) |
|
|||||||||
|
|
Construction Management: |
|
|||||||||
|
|
Design services for the Bangkok Waste Water Project: |
|
|||||||||
|
|
· |
Jacking Plates and Slurry tanks (for 3F Consultants, Euro Iseki) |
|
||||||||
|
|
· |
Temporary Works, Jacking Pits and Thrust Plates
(for |
|
||||||||
|
|
· |
Temporary Works and Jacking Pits (for NOSS Consortium) |
|
||||||||
|
|
· |
Independent Checker (NOSS Consortium) |
|
||||||||
|
|
Structural Design of Future World Theme Park in Rangsit. (for 3F Consultants) |
|
|||||||||
|
|
Design of steel form work for concrete (for Alpi South East Asia) |
|
|||||||||
|
|
Independent Structural Survey of explosion damage
to Jetty at |
|
|||||||||
|
|
|
||||||||||
|
|
|
|
|||||||||
|
|
|
||||||||||
|
|
|
|
|||||||||
|
|
|
||||||||||
|
|
Consultant to main contractor of Westlink motorway project, |
|
|||||||||
|
|
|
||||||||||
|
|
Steel connection design for fabrication
sub-contractor - International Exhibition Centre, |
|
|||||||||
|
|
|
||||||||||
|
|
Design and Construction supervision for Pasar Pagi Flyover, |
|
|||||||||
|
Lao PDR |
|
||||||||||
|
|
Design, fabrication and operation of Incremental
Launching equipment for the Lao 3 Bridges Project. Three long span steel bridges constructed under AUSAid funding (for John Holland). |
|
|||||||||
|
|
|
||||||||||
|
|
Consultant – Design of 230 m span heavy maintenance Hanger for Malaysian Airways, for the Kuala Lumpur International Airport (Scott Wilson) |
|
|||||||||
|
|
Consultant to contractor – construction of |
|
|||||||||
|
|
|
||||||||||
|
|
Design, commission and operate launching equipment for Taiwan Second Freeway, (for L & M Systems specialist contractor) |
|
|||||||||
|
|
· |
Form carriers for cantilever construction |
|
||||||||
|
|
· |
Incrementally launched bridges |
|
||||||||
|
|
Design of pre-stressed concrete bridges for Taichung Beltway. (for 3F Consultants) |
|
|||||||||
|
|
|
||||||||||
|
|
|
|
|||||||||
|
|
|
|
|||||||||
|
|
Consultant - Design Audit and Review of QA
procedures for |
|
|||||||||
|
April
2007 |
|
||||||||||